1.1.1 (2018-02-03) -

- TI-102  Exclusions stopped working
          (thanks to Christian Decker)

------ current release ---------------------------

1.1.0 (2018-01-13) 836bc41014018ab333e6ea73412ee09d015beb4e

- TD-120  Missing cmakedefine for HAVE_GET_CURRENT_DIR_NAME
          (thanks to Jörg Krause, Ben Boeckel).
- TW-1845 Cygwin build fails, missing get_current_dir_name
          (thanks to hosaka).
- TW-1936 Tweak tests to have fuller TAP compliance
          (thanks to Paul J. Fenwick)
- TI-27   Continue tracking by ID
          (thanks to Dennis Schubert)
- TI-29   timew config can't add new value
          (thanks to Yury Vidineev)
- TI-32   taskwarrior hook script doesn't stop recording waiting task
          (thanks to Yury Videneev).
- TI-39   Bogus command line option causes segfault
          (thanks to Jan Stolarek, Thomas Lauf).
- TI-40   totals.py extension script fails with an error
          (thanks to Jan Stolarek)
- TI-42   refresh holiday script throws an error on nb-NO locale
          (thanks to Jelle van der Waa).
- TI-43   :lastweek on sunday
          (thanks to Michel Crucifix).
- TI-46   Display error in visual reports (day,week,month)
          (thanks to Michael Meier)
- TI-47   first call successfully creates new database but returns exit status 1
          (thanks to Georg Sauthoff).
- TI-48   Timewarrior hook is not Python3 compatible
          (thanks to Josh Proehl, Armado Martinez)
- TI-49   new theme files aren't installed
          (thanks to Richard Brown).
- TI-51   in the taskwarrior hook, deleting a task doesn't stop the watch
          (thanks to Mattia Rizzolo).
- TI-52   The 'refresh' scripts overwrites previous years data
          (thanks to m8r).
- TI-58   Delete command is not always deleting
          (thanks to Lynoure, asmyers).
- TI-61   Typo in exclusion.t.cpp
          (thanks to Thomas Lauf).
- TI-62   TimeWarrior should not ignore invalid command
- TI-64   Command 'stop' with date before current interval's start date causes
          segfault
          (thanks to Thomas Lauf).
- TI-65   The 'tags' command should support a filter
- TI-66   Move with :adjust leaves overlapping intervals.
          (thanks to A M)
- TI-67   Summary with parameters shows wrong ids
          (thanks to Bodo Graumann)
- TI-68   Cannot shorten interval which has been moved into an exclusion.
          (thanks to A M)
- TI-69   timew config converts integers to times
          (thanks to Thomas Lauf).
- TI-70   Timew starts a new interval even if a current interval contains the
          same set of tags
          (thanks to Thomas Babej).
- TI-73   timew move with a specific time broken on 1.1.0
          (thanks to A M).
- TI-75   The :fill hint not properly detecting the last interval
          (thanks to Thomas Babej).
- TI-77   timew track seems to think today is tomorrow
          (thanks to A M).
- TI-78   Tag parsing broken for tags starting with "or_"
          (thanks to Lukas Barth).
- TI-81   Allow correction with filtered ids
          (thanks to Plup)
- TI-85   :adjust creates overlapping interval
          (thanks to Tim Ruffing)
- TI-90   Let 'continue' accept a date or a date range
- TI-91   Timewarrior does not compile on DragonFly
          (thanks to Michael Neumann)
- Fixed Python 3 support of the holiday/refresh script
          (thanks to Jelle van der Waa).
- Added missing man page link
          (thanks to David Patrick).
- Taskwarrior projects are now used as-is as tags, and also split on the '.' to
  represent project hierarchy as separate tags.
          (thanks to Josh Proehl).
- New date names supported (see 'timew help date' or 'man timew').
- Named dates 'socw', 'socm', 'socq' and 'socy' are now named 'sow', 'som',
  'soq' and 'soy'. Similarly the 'eocw' etc are modified. The 'c' is now
  implicit.

------ old release -------------------------------

1.0.0 (2016-08-17) 6428ce89fcf2a5665d9351c50c2a84c98543206c

- WWW-12  yesterday tag not recognized
          (thanks to Michel Crucifix).
- TI-34   Make timew more user-friendly by adding --help and default output
          (thanks to Felix Wolfsteller).
- Added 'totals.py' sample extension.
- Added extension list to the 'help' command.

1.0.0.beta1 (2016-07-26) -

- TI-9    Task spanning over whole day should show up as taking 24:00 instead
          of 23:59
          (thanks to Tomas Babej).
- TI-10   The 'total' summands in the month report are not aligned with the
          column name
          (thanks to Tomas Babej).
- TI-11   Ids displayed incorrectly
          (thanks to Michael Meier).
- TI-12   report command does not find extensions
          (thanks to lumbric).
- TI-14   Warn when new tags are being created
          (thanks to Matthias Rieber).
- TI-16   Should handle case where taskwarrior hook is used before timew
          (thanks to Aaron Curtis).
- TI-17   ids of tracked activities should not change when editing
          (thanks to lumbric).
- TI-18   Add remove/delete command
          (thanks to lumbric).
- TI-20   Week number does not agree with Taskwarrior
          (thanks to Dirk Deimeke).
- TI-22   The 'day' chart crashes if there is an open interval and no others
- TI-25   Work week not blocked off in charts
          (thanks to Jonathon Bly).
- TI-34   Make timew more user-friendly by adding --help and default output
          (thanks to Felix Wolfsteller).
- timew 0.9.5~alpha install bug
          (thanks to Gordon Ball).
- Improved out-of-source build for themes, holidays
          (thanks to Kent R. Spillner).
- The rc.reports.<type>.totals setting should control 'Totals' label
          (thanks to Matthew Lemon).
- Supports rc.reports.<type>.cell to control the number of minutes that one
  character cell represents on a chart.
          (thanks to Matthew Lemon, Rene Vergara).
- Added basic color themes.
- Fixed problem where a specific start time closed the previous open interval
  at the current time.
          (thanks to Michael Meier).
- Fixed utf8 encoding in Taskwarrior integration hook
          (thanks to Martin Boeker).
- Added DOM support and a 'get' command.

0.9.5.alpha (2016-06-20) -

- TD-49   Log when file management fails
          (thanks to Ben Boeckel).
- TD-115  Throw error when config file is missing or not readable
          (thanks to Jelle van der Waa).
- TI-2    Two line tags causes false entry in database
          (thanks to Sebastian Uharek).
- TI-3    The month report shows multi-days current task truncated
          (thanks to Tomas Babej).
- TI-4    The 'timew' command considers only the last interval
          (thanks to Tomas Babej).
- TI-5    Unicode tags not working.
          (thanks to Sergey Trofimov).
- TI-6    Exception after shortening task.
          (thanks to Sergey Trofimov).
- TI-7    Stop command shouldn't interrupt unrelated tags.
          (thanks to Sergey Trofimov).
- TI-8    Only the day's last interval is considered in the month report
          (thanks to Tomas Babej).
- Added 'continue' command.
- Added 'diagnostics' command.
- Added 'export' command.
- Added 'extensions' command.
- Added 'help' command.
- Added 'start' command.
- Added 'stop' command.
- Added 'tags' command.
- Integrated libshared.git.
- Colored tags supported.
- Added Taskwarrior hook script to integrate Timewarrior.
- Added support for the ':debug' and :quiet hints.
- Added support for the :day, :week, :month, :quarter and :year hints.
- Added 'track' command.
- Added 'cancel' command.
- Added 'config' command.
- Added 'tag' command.
- Added 'untag' command.
- Added 'shorten' command.

Design completed 2016-03-13
Project started  2015-11-29

------ start -----------------------------------
